Current
378
+18% vs last month
Top project
Mumbai Metro L4
112 · 30% share
Most loaded assignee
Vikram Shah
PMC · 64 items
Top discipline
Structural
108 items
Activity over time
Last period · drillable timeframe
By assignee
Workload distribution
VS
Vikram Shah
PMC
64
Highest
AM
Anjali Mehra
Design Consultant
51
KR
Karthik Rao
MEP Consultant
42
QL
Quality Lead
QA/QC
28
Lowest
By discipline
Where the load originates
| RFI # | Project | Subject | Assignee | Priority | Status | Aging |
|---|---|---|---|---|---|---|
| RFI-2026-0478 | Chennai Coastal Highway | Approved aggregate source for RMC at Batch Plant-2 | Quality Lead | Medium | Approved | 13d |
| RFI-2026-0476 | Mumbai Metro Line 4 | Architectural finish schedule for Concourse Level | Architect | Low | Closed | 26d |
| RFI-2026-0475 | Delhi-Mumbai Expressway Pkg-12 | Crash barrier type at viaduct approach | Highway Consultant | Medium | Rejected | 20d |