Dashboard/Drilldown/Pending RFIs
KPI Drilldown

Pending RFIs

Awaiting action — Submitted, Under Review or Clarification

Current
64
-5.1% vs last month
Top project
Mumbai Metro L4
22 · 34% share
Most loaded assignee
Anjali Mehra
Design Consultant · 11 items
Top discipline
Structural
18 items
By assignee

Workload distribution

AM
Anjali Mehra
Design Consultant
11
Highest
KR
Karthik Rao
MEP Consultant
9
GC
Geotech Consultant
Consultant
6
FC
Façade Consultant
Consultant
4
Lowest
By discipline

Where the load originates

Underlying RFI records

4 matching records — click to open the lifecycle view

RFI #ProjectSubjectAssigneePriorityStatusAging
RFI-2026-0481Mumbai Metro Line 4Clarification on rebar lap length at Pier P-23Anjali Mehra
High
Under Review
6d
RFI-2026-0479Navi Mumbai Int'l Airport T1MEP duct routing conflict with structural beam B-412Karthik Rao
Medium
Clarification
8d
RFI-2026-0477Bengaluru Suburban Rail Ph-2OHE mast foundation type for soft soil zoneGeotech Consultant
High
Submitted
3d
RFI-2026-0474Navi Mumbai Int'l Airport T1Façade glazing U-value complianceFaçade Consultant
High
Under Review
7d