Current
11
+2 vs last month
Top project
DME Pkg-12
4 · 36% share
Most loaded assignee
Rajeev Kulkarni
PMC · 4 items
Top discipline
Drainage
4 items
Activity over time
Last period · drillable timeframe
By assignee
Workload distribution
RK
Rajeev Kulkarni
PMC
4
Highest
HC
Highway Consultant
Consultant
3
GC
Geotech Consultant
Consultant
2
AM
Anjali Mehra
Design Consultant
2
Lowest
By discipline
Where the load originates
| RFI # | Project | Subject | Assignee | Priority | Status | Aging |
|---|---|---|---|---|---|---|
| RFI-2026-0480 | Delhi-Mumbai Expressway Pkg-12 | Drainage chamber invert level mismatch at CH 248+700 | Rajeev Kulkarni | Critical | Overdue | 16d |
| RFI-2026-0476 | Mumbai Metro Line 4 | Architectural finish schedule for Concourse Level | Architect | Low | Closed | 26d |
| RFI-2026-0475 | Delhi-Mumbai Expressway Pkg-12 | Crash barrier type at viaduct approach | Highway Consultant | Medium | Rejected | 20d |