Dashboard/Drilldown/Avg. Response Time
KPI Drilldown

Avg. Response Time

Mean time from RFI submission to first response

Current
3.2 d
-0.4 d vs last month
Top project
Mumbai Metro L4
2 · 28% share
Most loaded assignee
Anjali Mehra
Design Consultant · 1 items
Top discipline
Structural
2 items
Response time trend (days)

Last period · drillable timeframe

By assignee

Workload distribution

AM
Anjali Mehra
Design Consultant
1
Highest
VS
Vikram Shah
PMC
2
KR
Karthik Rao
MEP Consultant
3
HC
Highway Consultant
Consultant
6
Lowest
By discipline

Where the load originates

Underlying RFI records

8 matching records — click to open the lifecycle view

RFI #ProjectSubjectAssigneePriorityStatusAging
RFI-2026-0481Mumbai Metro Line 4Clarification on rebar lap length at Pier P-23Anjali Mehra
High
Under Review
6d
RFI-2026-0480Delhi-Mumbai Expressway Pkg-12Drainage chamber invert level mismatch at CH 248+700Rajeev Kulkarni
Critical
Overdue
16d
RFI-2026-0479Navi Mumbai Int'l Airport T1MEP duct routing conflict with structural beam B-412Karthik Rao
Medium
Clarification
8d
RFI-2026-0478Chennai Coastal HighwayApproved aggregate source for RMC at Batch Plant-2Quality Lead
Medium
Approved
13d
RFI-2026-0477Bengaluru Suburban Rail Ph-2OHE mast foundation type for soft soil zoneGeotech Consultant
High
Submitted
3d
RFI-2026-0476Mumbai Metro Line 4Architectural finish schedule for Concourse LevelArchitect
Low
Closed
26d
RFI-2026-0475Delhi-Mumbai Expressway Pkg-12Crash barrier type at viaduct approachHighway Consultant
Medium
Rejected
20d
RFI-2026-0474Navi Mumbai Int'l Airport T1Façade glazing U-value complianceFaçade Consultant
High
Under Review
7d